As a subsidiary of CPEG, additional thermal and dry solids processing and material handling equipment is available to supplement and build out your production line.

Calciners, Conveyors, Vibratory Fluid Beds, Baghouses, and more.

6U8-JS Heating / Cooling Conveyor

  • Integral jacket for insulation, heating and cooling fluid
  • Hinged jacket (with integral stop) and fastened into place with clamps
    (inlet cover to be removable)
  • Journals thru-bored, equipped with single flow unions to allow cooling fluid flow through shaft
  • Covers on trough are gasketed (with temperature appropriate material)
  • Designed for low pressure, 14.9 psig max. (non-ASME coded jacket)
  • Split packing gland seals with temperature appropriate packing and set up with air purge
  • 2 HP, TEFC, 1750 RPM, 3/60/230-460 motor
  • 120 VAC Limit switch mounted (not wired)
  • Internal flow baffles
  • Foot mounted gear reducer for a nominal speed of 20 RPM
  • Portable base with instrumentation
heating and cooling screw conveyor

Auger Design

  • 1/2 Pitch, 1/4″ thick right hand flighting constructed of 304 stainless steel
  • Shafting constructed of 3″ schedule 40 pipe
  • Product contact surfaces to be 2B mill finish
  • Exterior stainless steel surfaces to be mill finish
  • Interior welds to be continuous and ground smooth and flush to 80 grit, no pits, cracks, or crevices allowed
  • Jacket welds are continuous and ground smooth
  • Exterior, non-jacket welds are intermittent, wire brushed and gaps sealed with Devcon
  • All carbon steel components to be painted with one (1) primer coat and one (1) top coat (S. Howes standard blue)

Construction Details

  • 304 stainless steel in product contact areas
  • Drive and discharge end plates to be welded
  • Inlet, outlet and drain couplings
  • Two (2) couplings for process chamber purge
  • 6″ OD plain tube inlet and tube discharge
  • U-Trough style housing, 8 feet long inside
  • Trough form constructed of 7 gauge 304 stainless steel
  • Trough to have formed for cover mating surfaces
  • End plates constructed of 5/16″ thick 304 stainless steel
  • Covers constructed of 10 gauge 304 stainless steel
  • Overlapping covers require discharge cover to be opened first
  • Saddle supports along conveyor for mounting to supplied structure
  • Chain and shaft guards
  • Primary shaft, chain and sprocket connection for thermal break
  • Heavy-duty shaft pipe with flanged journals
  • Flange block bearings for auger support
Installation sketch

To rent a stock item call 716.934.2611 or fill out and submit the form below.